
GIFL Project: Cultural Heritage Evaluation Report
The Chippewas of Georgina Island First Nation, in collaboration with the WSP technical team, have finalized the Cultural Heritage Evaluation Report (CHER). This report aims to help the First Nation understand the cultural heritage value within the Fixed Link Study Area. The document is now available online.
Recent Posts

Recap: Georgina Island Fixed Link Project – December 11, 2024, Virtual Information Session
On December 11, 2024, a Virtual Information Session was held to provide an update on the Georgina Island Fixed Link Project. Approximately 85 participants attended the session, which was part of the ongoing engagement process undertaken by the Chippewas of Georgina Island First Nation.
.jpeg)
Coastal Engineering Assessment for the Georgina Island Fixed Link Project
This report outlines valuable insights supporting the preliminary design of the proposed bridge and causeway connecting Georgina Island to the mainland.

New Renderings Unveiled for the Georgina Island Fixed Link Project
Renderings reflect updated design following feedback from community and scientific experts